Manufacturing Plant construction

This project involved the construction of a state-of-the-art manufacturing facility for chrome plating, incorporating both traditional and advanced systems, including machining and polishing. Built on a 10,000m² greenfield site, the facility features a 5,100m² manufacturing building with a 12m high roof to accommodate an overhead crane across five bays.

A key feature is the 40m long, 6m deep concrete pit in Bay One, housing traditional tanks for the chrome plating line. Additionally, the facility includes a two-level office and amenities area spanning 900m², constructed with durable concrete floor slabs and precast panels.

To meet the site's significant power and gas requirements, we coordinated the installation of kiosks, a substation, and a high-pressure gas supply, ensuring seamless integration with the facility's operations. This comprehensive approach highlights our expertise in managing complex industrial construction projects.